Case Study - Malaysia Sime Darby, Selangor, Malaysia

Project data

  • Customer
  • Sime Dary
  • Value
  • Confidential
  • Area
  • 130,000 sq ft
  • Form of contract
  • Main contractor
  • Programme duration
  • 14 weeks
  • Completion date
  • August 2018
  • Architect
  • Steven Leach + Associates

Introduction

Enter your content here

Aside from the fit out of general areas, we were responsible for the IT, audio visual and system security installations across all floors of the facility, a full suite of structural modifications involving demolition works, slab strengthening and slab cutting, along with all related mechanical, electrical and plumbing (MEP) scope to take the space from its shell and core environment.

The high-end fit out includes an extensive pallet of architectural materials and finishes, including a sculptural central column feature, multiple wall veneer treatments, and a series of complex ceiling interfaces.

Sime Darby HQ stairs - ISG
Sime Darby HQ stairs - ISG

Aside from the fit out of general areas, we were responsible for the IT, audio visual and system security installations across all floors of the facility, a full suite of structural modifications involving demolition works, slab strengthening and slab cutting, along with all related mechanical, electrical and plumbing (MEP) scope to take the space from its shell and core environment.

The high-end fit out includes an extensive pallet of architectural materials and finishes, including a sculptural central column feature, multiple wall veneer treatments, and a series of complex ceiling interfaces.

A further critical milestone of the project involved hoisting a curved glazing feature via mobile crane to the Chairman’s room, located on the tenth floor of the building.

This outstanding project demonstrates that even with a highly demanding programme and key procurement challenges, an absolute focus on customer experience and high-quality delivery will always set the conditions for success. Sime Darby’s new headquarters are a physical expression of the company’s vision and values and provide a real statement of intent for this highly regarded organization.