Case Study - Taylor’s College Campus, Malaysia

Project data

  • Customer
  • Taylor's College
  • Value
  • GBP 2m – 5m (RM13, 480,000)
  • Area
  • 22,000 sq ft
  • Programme duration
  • 12 weeks
  • Completion date
  • January 2010
  • M&E Engineer
  • Primetech Asia

Overview

The Taylor's College campus has redefined tertiary education standards in Malaysia.

Located in a fully serviced stand-alone campus complete with its own lake, the new facilities within Taylor’s College have elevated the student learning experience to new levels. As part of the overall premises solution, ISG was responsible for delivering the interior and building services installation to a diverse range of accommodation requirements across five buildings that included the following: student intake and student affairs facility, student union, library, three campus restaurants, culinary bar, theatre, technical training rooms, and lecturer’s and department offices.

By taking the space from shell and core, ISG was responsible for all fit out and engineering elements associated with each of the campus areas.